Deloitte

Approx. Mech. Value: $4,000,000.00

Builder: Built

Services Consultant: NDY

Approx. Mech Program: Dec 2008 - Apr 2009

bourke

The Deloitte Fitout at 550 Bourke st involved the Green Star rated fitout of levels 7 through 19 including executive floors and UPS server room. Starting from an empty shell our works comprised the complete Mechanical installation from the building core outwards including the following systems,

  • ·Approximatley 280 VAV boxes with almost half of those having HHW coils
  • · In excess of 60 Water cooled Airconditioning Units
  • · Over 50 Duct mounted Supply/Exhaust Fans
  • · Supply and Return Air Duct distribution system complete with Swirl type air diffusers
  • · Kitchen Exhaust and Make-up air system
  • · Heat Recovery system to executive floors
  • · In excess of 4000m of insulated Heating Hot Water Pipework
  • · DDC Controls System

 

 

 Other Fitout Works:

  • 414 Latrobe street, ATO Fitout
  • 367 Collins street, Optus Fitout
  • 121 Williams street, Comcare Fitout
  • 303 Collins street, Amenities Upgrade
  • 530 Collins street, AAR Fitout